Demo/Junk Removal

This is AD&H's Demolition & Junk Removal projects page. It's a great opportunity to understand the context and background of our latest work in this area. Most of AD&H's work has been in this area.

D = Demolition Projects

J = Junk Removal Projects

D1 North Scottsdale

Nursing Home Wall Removal

One of our first jobs as demolitionists, AD&H took on the task to remove two areas of drywall in a shower/tub area in a bathroom. one piece was sized ~5 ft by ~ 3 ft, and the other was 1 ft by ~5-6 in (to the wall closest to this paragraph). A well-known general contractor subcontracted this job to AD&H.

NSNH IV.jpg
NSNH I.jpg
NSNH III.jpg

J2 Movin' On

Storage Warehouse Junk Removal

CSR I.jpg

This is your Project description. Provide a brief summary to help visitors understand the context and background of your work. Click on "Edit Text" or double click on the text box to start.

CSR II.jpg

D3 Scottsdale Resort

Digging Trench
Plumbing

VVR I.jpg

This job was subcontracted to AD&H from a licensed plumber to dig out a trench for the main water lines, and ventilation can run through. The homeowner wanted to move the kitchen sink to create its own island.

VVR II.jpg
VVR III.jpg
VVR IV.jpg
VVR V.jpg

D4 Fountian Hills Home 

Residential Home Wall Removal

Subcontracted by a licsenced plummber, I was tasked to remove ~3 ft by ~5 ft, and ~8 ft by ~2 ft of areas of drywall so the plumber can work his new pipes through.

FHWR 1.b.jpg
FHWR 1.a.jpg
FHWR 2.b.jpg
FHWR 2.a.jpg

D5 Fountian Hills Home 

Residential Home Concrete Removal

Same home as the previous home, subcontracted by a licensed plumber. I was tasked with removing a ~2 ft by ~6 in. hole around the toilet.

FHCR I.jpg
FHCR IV.jpg
FHCR II.jpg
FHCR V.jpg

D6 Fountian Hills Home 

Residential Home Concrete Removal

Same home as the previous home, subcontracted by a licensed plumber. This time, AD&H was tasked to remove a 2 x 6-foot slab of concrete around the master bedroom toilet pipe.

D7 Wickenberg Business 

Gas Station Stucco Removal

Subcontracted by a general contractor to remove some stucco to create a new pathway for a floor trap escape. Once the stucco was removed the pipe was cleared and exposed as much as possible. 

WBSR I.jpg
WBSR II.jpg
WBSR IIa.jpg